The JMCJ-1003/1005 magnetic ring settlement water level gauge gives Kingmach Single-point Settlement Meter a manual borehole method for layered ground. It measures underground settlement by electromagnetic induction between the probe and magnetic rings, and it measures water level by conductivity when the probe contacts groundwater. The instrument uses a probe, reel, tape, battery, audible or visual indication, and magnetic rings placed at known depths. Published depth options include 30 m, 50 m, and 100 m, with plus or minus 1 mm accuracy, 9V battery power, maximum current of 50 mA, a probe about 17 cm long and 3 cm in diameter, and -20 degrees Celsius to 60 degrees Celsius operating environment. This product is useful where the engineer needs to know which soil layer compressed, not just how much the surface moved. A careful log should keep borehole number, ring depth, water depth, reference mark, operator, weather, and construction activity together for each visit.

Application of  Single-point Settlement Meter

Application of Single-point Settlement Meter

In bridge deflection and pier foundation monitoring, Single-point Settlement Meter help engineers follow vertical behavior that may change with traffic, temperature, bearing response, scour, or foundation compression. Kingmach JMQJ-62XXADT micro range hydrostatic level sensors provide 50 mm and 100 mm ranges, 0.01 mm resolution, RS485 output, and IP68 protection for small movements near decks, piers, or abutments. JMDL-62XXADT hydrostatic sensors can connect several measuring points through tubes, allowing a bridge team to compare related locations against a common reference instead of reading each point alone. A practical layout may place sensors near pier caps, bearing seats, approach slabs, or foundation observation positions, depending on the risk being tracked. The daily review should not look at the settlement curve by itself. Traffic loading, temperature swing, inspection findings, bearing condition, river level, and nearby structural instruments give the curve meaning. If a pier point drifts while the deck and approach slab stay stable, the cause is different from a whole-span temperature response. Clear naming, stable reference control, and consistent reading intervals turn small vertical changes into usable maintenance evidence.

The future of Single-point Settlement Meter

The future of Single-point Settlement Meter

Future Single-point Settlement Meter reports will need to be clearer for both engineers and owners. A useful settlement report should show baseline date, latest value, cumulative settlement, rate of change, reference point status, water level condition, construction stage, and recommended inspection action. It should also include whether the reading was manual, remote, magnetic ring based, hydrostatic, or embedded single-point measurement. Kingmach products generate different kinds of settlement information, so reporting should preserve that context instead of flattening every value into one table. For high-risk projects, trend graphs should sit beside field notes and photos. That makes it easier to decide whether a movement is normal consolidation, reference disturbance, water-related change, or a condition that needs immediate review. The practical goal is to keep settlement data understandable after the original installation crew has left, so owners can compare old and new readings without reconstructing the field history from memory. The same record should remain readable for designers, contractors, owners, and maintenance teams, because settlement monitoring often continues long after the first construction report is finished.

Care & Maintenance of Single-point Settlement Meter

Care & Maintenance of Single-point Settlement Meter

Embedded Single-point Settlement Meter such as JMDL-47XXAT require protection during earthwork, paving, and later traffic. The settlement plate, measuring rod, metal flexible conduit, anchor head, extension rod, bottom anchor, and side-exit cable should be installed without being bent or crushed by compaction equipment. Record installation depth, gauge length, cable exit point, fill layer, protection cover, and first stable reading before the point is buried. During maintenance, inspect accessible cable sections, junction boxes, cabinet terminals, and any area where later excavation may have disturbed the line. If a curve changes after a filling stage or pavement operation, compare the timing with construction logs before judging the ground response. Buried parts are difficult to inspect after coverage, so photographs, as-built sketches, and cable route notes become part of the working instrument. Good embedded-point care is mostly quiet prevention done before damage becomes visible.

Kingmach Single-point Settlement Meter

For procurement and technical selection, Single-point Settlement Meter should be matched to expected movement scale, access, and monitoring method. A micro range hydrostatic sensor with 0.01 mm resolution is not the same tool as a wide-range differential pressure sensor covering up to 4000 mm, and neither replaces a magnetic ring gauge used for borehole layer readings. Kingmach's category includes JMDL-47XXAT, JMDL-62XXADT, JMQJ-62XXADT, JMYC-62XXAD, and JMCJ-1003/1005, each aimed at a different settlement task. Before ordering, engineers should define whether the point is embedded, connected by water tube, manually probed, remotely acquired, or compared with a reference sensor. The best specification starts with the field question, then selects the instrument. Procurement teams should therefore ask not only for range and accuracy, but also for installation method, reading method, protection level, and data handover format. Procurement teams should therefore ask not only for range and accuracy, but also for installation method, reading method, protection level, and data handover format.

FAQ

  • Q: What is JMCJ-1003/1005 used for?
    A: It is used to measure layered underground settlement and groundwater level in foundations, subgrades, foundation pits, embankments, and underground structures.

    Q: How does magnetic ring settlement reading work?
    A: Magnetic rings are placed underground; when the probe senses a ring, audible and visual alerts help the operator read depth from the steel tape at the borehole.

    Q: How is water level detected?
    A: The water level component works by water conductivity and alerts when the probe contacts water.

    Q: What accuracy is listed?
    A: The listed measurement accuracy is plus or minus 1 mm.

    Q: What field records are needed?
    A: Keep borehole number, magnetic ring depth, previous reading, current reading, groundwater level, and operator notes together.

Reviews

Michael Anderson

The strain gauges and load cells are extremely accurate and stable. They performed very well in our bridge monitoring project. Highly recommended!

Robert Taylor

The weir flow meter is well-built and delivers accurate measurements. Great value for water management applications.

Latest Inquiries

To protect the privacy of our buyers, only public service email domains like Gmail, Yahoo, and MSN will be displayed. Additionally, only a limited portion of the inquiry content will be shown.

Mia***@gmail.comNetherlands

Dear team, we are interested in your readouts & data loggers compatible with multiple sensors. Do yo...

Evelyn***@gmail.comSouth Africa

Hi, we are a contractor working on tunnel construction and need settlement sensors and displacement ...

Not finding what you're looking for?
Contact our consultants for more available products.

Request A Quote Now

GET IN TOUCH

If you are interested in our products or want to become our partner.

Please leave your contact information, our team will contact you as soon as possible.

Contact Us Now
Copyright © Kingmach Measurement & Monitoring Technology Co., Ltd.
get a quote
Your Name:
E-mail:*
Company:
Phone/WhatsApp:
Content: